by Kent Holland | Sep 19, 2019 | Newsletter Article
The U.S. Army Corps of Engineers (USACE) incorrectly interpreted and applied contract specifications to require a contractor to do high grade drywall finishing in the plenum above walls and in the plenum below floors – areas that would never be seen by the public. A...
by Kent Holland | Dec 23, 2015 | Newsletter Article
J. Kent Holland, J.D. A trial court erred when it considered the course of dealings of the parties to determine the meaning of a design professional contract, and then issued a jury instruction advising the jury that the contract was not ambiguous. As a result, a $2...