The U.S. Army Corps of Engineers (USACE) incorrectly interpreted and applied contract specifications to require a contractor to do high grade drywall finishing in the plenum above walls and in the plenum below floors – areas that would never be seen by the public. A...
by Kent Holland | Feb 9, 2011 | Newsletter Article
by Michael C. Loulakis Record Steel and Construction v. United States , 62 Fed. Cl. 508 (2004), provides an excellent example of the evolution of design-build caselaw. The dispute in this case involved whether a design-build contract required foundations to be...