by Kent Holland | Jul 26, 2017 | differing site conditions, Newsletter Article
By: J. kent Holland, Jr. The U.S. Army denied a differing site condition claim of its contract that allegedly encountered subsurface rock conditions as well as ground water conditions, differing materially from what was represented in a geotechnical report provided to...
by Kent Holland | Jun 1, 2017 | differing site conditions, Newsletter Article
Geotechnical, Saturated Soil, Geotechnical Report, Metcalf Construction During site excavation, a design-build contractor encountered a large quantity of unsuitable soils, and this required remediation before foundation work could commence for a building. In this...
by Kent Holland | Dec 19, 2016 | Newsletter Article
Where a contractor sought a request for clarification to the project architect concerning whether rebar was to be tied from the floor slab to the pile caps, the architect responded with a clarification, that ultimately became a change order, directing the slab rebar...