by Kent Holland | Jul 26, 2017 | differing site conditions, Newsletter Article
By: J. kent Holland, Jr. The U.S. Army denied a differing site condition claim of its contract that allegedly encountered subsurface rock conditions as well as ground water conditions, differing materially from what was represented in a geotechnical report provided to...
by Kent Holland | Jun 1, 2017 | differing site conditions, Newsletter Article
Geotechnical, Saturated Soil, Geotechnical Report, Metcalf Construction During site excavation, a design-build contractor encountered a large quantity of unsuitable soils, and this required remediation before foundation work could commence for a building. In this...
Connect