by Kent Holland | Feb 9, 2011 | Newsletter Article
In response to a plaintiff’s suit against an engineer alleging breach of an express warranty, a court held that the complaint must be dismissed because the record revealed no express warranty, and if the service was performed negligently the cause of action must be...
by Kent Holland | Feb 9, 2011 | Newsletter Article
Contracts requiring a design-build engineering firm to supply “basic engineering packages” for licensing and technology transfer agreements for the design and construction of a processing plant for sodium hydroxide (caustic soda) contained a liquidated damages clause...
by Kent Holland | Feb 8, 2011 | Newsletter Article
A court dismissed a developer’s suit for fraud, negligent misrepresentation, and breach of warranty against the design firm (A/E) that provided engineering and surveying services for the development of a residential community. The developer argued that the A/E was...
by Kent Holland | Feb 7, 2011 | Newsletter Article, time limits
A homeowner (Northridge) retained an architectural firm (JWFA) to provide design and contract administration services for the renovation of a residential townhouse complex. Leaks were found in the roofs shortly after construction was completed. It was not until...
by Kent Holland | Feb 7, 2011 | differing site conditions, Newsletter Article
Where a general contractor prepared its bid in reliance upon information provided by the project owner’s engineer, and the site conditions differed from what was represented, the contractor sued the engineer for misrepresenting the conditions. Both the...