by Kent Holland | Feb 7, 2011 | Newsletter Article
A construction contractor (Laquilia Construction, Inc.) poured concrete that failed to meet the specifications for minimum strength for the floor slab of a high rise commercial building. The defective concrete had to be ripped out and replaced. This replacement...
by Kent Holland | Jan 30, 2011 | Newsletter Article
Where a subcontractor, without knowledge or permission of the prime contractor, purchased and installed shingles on the roof of a new garage that were a different color and an inferior grade than specified by the contract, the homeowner sued the prime contractor for...
Connect